Estiviel WWTP

Toledo, Spain

Wastewater treatment

Project type

36.000 m³/day

Daily capacity

The Estiviel Wastewater Treatment Plant was designed to treat 36,000 m³ of wastewater per day, serving the equivalent of 270,000 people across the city of Toledo.
edar_estiviel_toledo_2014_283_8
The facility treats most of the city's wastewater through an advanced biological process based on activated sludge technology and biological nutrient removal such as w Nitrogen and Phosphorus by biological means through the process called NIPHO plus.
edar_estiviel_toledo_2014_283_1
The project incorporates anaerobic sludge digestion and energy recovery from biogas, enhancing operational efficiency while supporting sustainable wastewater treatment.

Project data

·

Average design flow (Qm): 36.000 m3/d

·

Peak flow (1,7 x Qm): 135 m3/h

·

Maximum flow (5 x Qm): 7.500 m3/h

·

Flow to regenerate: 135 m3/h

·

Active sludge process at half load

·

Tertiary treatment of refines with anaerobic digestion of the sludge generated