Reuse of treated wastewater in Altona

Altona, Australia

Wastewater treatment

Project type

13.500 m³/day

Daily capacity

The Altona Water Reuse Plant was the first facility of its kind built in Australia and is capable of producing up to 13,500 m³ of reclaimed water per day.
altona_6

The project delivers advanced tertiary treatment for the reuse of water from an existing wastewater treatment plant serving approximately 50,000 people.

The facility combines ultrafiltration and multi-stage reverse osmosis technologies, enabling the production of different water qualities for urban and industrial applications.

altona_1

Project data

·

13,500 m³/d treatment capacity

·

Pretreatment process with disinfection

·

Ultrafiltration pressured hollow fibre membranes membrane protection filter with cartridges of 5 microns reverse osmosis with a caustic solution

·

Reverse osmosis with a caustic solution

·

Two forced vent towers of degassing

·

Remineralization with additional limestone and water slurry energy recovery through pressure exchange