ETAP Almoguera-Algodor

Madrid, Spain

Wastewater

Project type

259.200 m³/day

Daily capacity

The Almoguera–Algodor Drinking Water Treatment Plant was designed to produce 259,200 m³ of potable water per day, supporting water supply to several communities in southern Madrid.
etapalmogueraalgodormadrid2009254vistaaereaetapalmogueraalgodoridentificaciondeinstalacionesretocada
The Almoguera–Algodor Drinking Water Treatment Plant was designed to produce 259,200 m³ of potable water per day, supporting water supply to several communities in southern Madrid.
etap_almoguera-algodor_madrid_2009_254_cajas_de_presion_con_membranas_en_su_interior
The project incorporates ultrafiltration and reverse osmosis membrane technology, combined with physico-chemical treatment, clarification and disinfection systems, creating a high-capacity water treatment facilit

Project data

·

339,000 cu. ft/day

·

Physical- Chemical

·

Lamellar settling

·

Ultrafiltration membranes

·

Reverse osmosis membranes

·

Disinfection using monochloramine

·

Sludge Treatment