The Barrow River Bridge, delivered as part of the N 25 New Ross Bypass, set a world record for an extradosed concrete bridge with its two 230 m main spans.

The Barrow River Bridge, delivered as part of the N 25 New Ross Bypass, set a world record for an extradosed concrete bridge with its two 230 m main spans.







The main spans were constructed using the balanced cantilever method, forming a key element of the strategic transport corridor linking south-east Ireland
Project data
Project data
·
Length: 0,55 miles (0,4 miles the extradosed spans)
·
Span arrangement: 118 - 148 - 312 - 755 - 755 - 312 - 230 - 164 - 118 ft
·
Variable deck width from 19.9 m to 22.95 m
·
Height of the main pylon: 197 ft from the foundation (88,6 m above the deck).