Barrow River Bridge

Leinster, Ireland

Extradosed

Bridge type

230

Maximum light

887

Length

20,9 - 23,9

Broad

Road

Purpose

Concrete

Board material

Cantilevered advance

Construction procedure

The Barrow River Bridge, delivered as part of the N 25 New Ross Bypass, set a world record for an extradosed concrete bridge with its two 230 m main spans.
n25_new_ross_bypass_irlanda_septiembre_2018_346_53
The Barrow River Bridge, delivered as part of the N 25 New Ross Bypass, set a world record for an extradosed concrete bridge with its two 230 m main spans.
The main spans were constructed using the balanced cantilever method, forming a key element of the strategic transport corridor linking south-east Ireland

Project data

·

Length: 0,55 miles (0,4 miles the extradosed spans)

·

Span arrangement: 118 - 148 - 312 - 755 - 755 - 312 - 230 - 164 - 118 ft

·

Variable deck width from 19.9 m to 22.95 m

·

Height of the main pylon: 197 ft from the foundation (88,6 m above the deck).