Widening of the Rande Bridge

Pontevedra, Spain

Cable-stayed

Bridge type

400,17

Maximum light

2 x 7,1

Broad

Road

Purpose

Mixed (expansion)

Board material

Hoisting

Construction procedure

The Rande Bridge Widening, naugurated in 1981, represented the world’s first major widening of a cable-stayed bridge, increasing the capacity of one of the key transport links in north-west Spain.
puente_de_rande_pontevedra_4
The project added two new side carriageways to the existing structure, enhancing traffic flow along the AP 9 motorway while maximising the reuse of the original bridge.
All works were delivered while maintaining traffic on the bridge, minimising environmental impact on the Vigo estuary and ensuring uninterrupted operation throughout construction

Project data

·

Length of the cable-stayed bridge: 2.313 ft

·

Main-bridge spans: 484 – 1.313 – 484 ft

·

Pylons height: 394 ft Navigation vertical clearance: 148 ft

·

Maximum width: 77 ft

·

First large-scale cable-stayed bridge widening worldwide