Widening of the Rande Bridge
Pontevedra, Spain
Cable-stayed
Bridge type
400,17
Maximum light
2 x 7,1
Broad
Road
Purpose
Mixed (expansion)
Board material
Hoisting
Construction procedure
The Rande Bridge Widening, naugurated in 1981, represented the world’s first major widening of a cable-stayed bridge, increasing the capacity of one of the key transport links in north-west Spain.

The project added two new side carriageways to the existing structure, enhancing traffic flow along the AP 9 motorway while maximising the reuse of the original bridge.










All works were delivered while maintaining traffic on the bridge, minimising environmental impact on the Vigo estuary and ensuring uninterrupted operation throughout construction
Project data
Project data
·
Length of the cable-stayed bridge: 2.313 ft
·
Main-bridge spans: 484 – 1.313 – 484 ft
·
Pylons height: 394 ft
Navigation vertical clearance: 148 ft
·
Maximum width: 77 ft
·
First large-scale cable-stayed bridge widening worldwide