Robotic logistics warehouse for leader in e-commerce 

Madrid, Spain

64,000 m²

Built area

3

Number of floors

Logistics

Building type

The project developed in El Prat de Llobregat (Barcelona) involved the urban development of a 1,625,174sqft plot and the construction of a highly automated logistics complex, comprising two main warehouse and office buildings, together with ancillary structures and security control facilities.

plataforma_logistica_barcelona_2017_305_aereas_julio_2
The structural solution is based on a deep foundation system using precast driven piles reaching depths of up to 131.23 ft, connected through pile caps to a continuous reinforced concrete slab measuring 1,230.31 ft in length, 574.15 ft in width, and 19.69 in in thickness, executed without expansion joints. The superstructure is formed by precast concrete columns, beams, and slabs.

The pavement over the slab provides high flatness performance, essential to ensure the efficient operation of automated robotic systems for goods handling. Facade enclosures consist of precast concrete panels up to a height of 13.12 ft, with the upper sections completed using aluminum sandwich panels on a secondary steel structure. The roof is a lightweight deck-type system.

External works include parking facilities for 1,400 passenger vehicles, a pre-loading area with 21 truck parking spaces, and an additional secure parking area for 52 trucks within the controlled perimeter of the site.

Image

The project has been designed and constructed in accordance with the highest sustainability standards, achieving BREEAM Excellent certification.

In addition to this logistics facility in Barcelona, DRAGADOS has delivered other logistics centers for the same client in Seville, Murcia, Zaragoza, and Oviedo, further consolidating its experience in the development of advanced logistics infrastructures.

Project data

·

Urbanization:1,625,174sqft.

·

Warehouse:559,723sqft.

·

129,167sq ft office building.

·

Execution period: 13 months.

·

2,500 prefabricated piles driven 131.23 ft deep.

·

Slab of 39,234 yd3of concrete and 3,969 tons of steel.

·

Building: 1,210.63 ft long and 567.58 ft wide.

·

57 loading docks.

·

5 power transformation centers 2 and 5 MW in medium voltage.

·

78,740 ft air conditioning and ventilation ducts.

·

1,400 parking spaces for light vehicles.

·

120 spaces for motorcycles and 100 for bicycles.

·

73 parking spaces for trucks.

·

Excellent BREEAM certificate.

 