Aberdeen Harbour Expansion Project
Aberdeen, Scotland
Port
Project type
620 m
Breakwater length
1592 m
Berth length
16 m
Draft
22
Concrete caissons
497.460
Dredging volume (m³)
The Aberdeen Harbour Expansion Project at Nigg Bay (Scotland) delivers 1,700 metres of additional quay length and a minimum depth of 9 metres across an operational laydown area exceeding 125,000 square metres.

The works include extensive dredging operations, reaching depths of up to –12.95 m CD, combined with controlled rock blasting to allow manoeuvring and access for large vessels.
A new 620 metre northern breakwater has been constructed, consisting of a rubble mound core, a sub layer of 1–3 tonne rock armour, and a final armour layer of 8 m³ acropodes.






The development also features substantial land reclamation, using both imported materials and treated dredged material, amounting to over 362,000 m³ of fill and 87,000 m³ of rock armour.

A distinctive element of the project is the provision of 22 reinforced concrete caissons, manufactured in Spain, transported by semi submersible vessel to Cromarty, and later towed to Aberdeen for installation.
Project data
Project data
·
1,700 m of new quay infrastructure
·
2,146,145 m³ of dredged sediments
·
100,489 m³ of dredged rock
·
620 m rubble-mound breakwater
·
8 m³ acropodes
·
362,016 m³ of fill material and 87,276 m³ of rock armour
·
22 reinforced-concrete caissons transported from Spain
·
Explanada operativa de >125.000 m²