Outer Breakwaters of La Esfinge and Reina Sofía
Las Palmas, Spain
Vertical dike
Project type
1332 m
Breakwater length
25 m
Draft
21
Drawers
The La Esfinge and Reina Sofía breakwaters expand the sheltering capacity and berthing line of the Port of La Luz and Las Palmas through new maritime infrastructure providing more than 2.3 kilometres of new port alignments and creating additional operational areas.

The development combines rubble-mound and vertical caisson breakwaters. Phase II of La Esfinge includes a 330-metre rubble-mound section and a 627-metre vertical section 14 reinforced concrete caissons founded at depths of up to 26 metres. The Reina Sofía extension incorporates 11 prefabricated caissons supported on foundations located at depths of up to 60 metres.



The project stands out for the scale of the marine works and the logistics involved in manufacturing, transporting and installing large concrete caissons. The works also included reclamation areas, service galleries and port facilities required for future terminal operations.

Project data
Project data
·
More than 2.3 km of breakwaters and port alignments delivered through the La Esfinge and Reina Sofía expansions
·
29 large reinforced-concrete caissons installed or constructed, including units measuring up to 44.3 m long, 25 m wide and 29.5 m high
·
Marine works executed at depths of up to 60 m, among the most demanding conditions for this type of port infrastructure
·
More than 3 million tonnes and cubic metres of rock armour, filters and protection materials used in the construction of the breakwaters
·
More than 312,000 m³ of concrete placed in caissons, parapets and port superstructures
·
More than 9 million kg of reinforcing steel incorporated across the different phases of the project