Port of Hayovel Expansion

Ashdod, Israel

Port

Project type

1150 m

Breakwater length

1700 m

Berth length

14 m

Draft

3.0 Mm³

Dredging volume (m³)

50 Ha

Riprap (m3/t)

The Port of Hayovel Expansion significantly increased port capacity through the construction of new maritime infrastructure, logistics areas and berthing facilities for large vessels.

The project included the extension of the existing breakwater by 1,150 m, protected using Antifer concrete armour units, together with the creation of a 50-hectare reclaimed port platform and the execution of 3.2 million m³ of dredging works.

hayovel_2
The development also incorporated five new quays with a combined length of 1,700 m, delivered through several structural solutions including sheet pile walls, piled quays and caisson structures adapted to different operational requirements.

Project data

·

3,800 ft Breakwater Length

·

125 acres Reclaimed Land Esplanade

·

Dredging: 4 million cy

·

3.2 million m³ of dredging works

·

1,700 m of new quays

·

14 m operational draft

·

Protected with Antifer armour units

·

Five different quay typologies