Hampton Road Bridge Tunnel (HRBT)

Virginia, USA

Variable Density TBM

Construction method

2 x 2,400 m

Excavated length

12.65m/14.05m

Internal Diameter / Excavation

1 TBM

TBM number

57m

Depth

The Hampton Roads Bridge-Tunnel (HRBT) project is expanding one of Virginia’s busiest transport corridors through the construction of two new tunnels beneath Chesapeake Bay, designed to increase capacity and reduce congestion.
hampton_roads_bridge_and_tunnel_virginia_eeuu_2025_4

The scheme addresses traffic volumes exceeding 100,000 vehicles per day during peak periods, significantly above the original design capacity of the existing infrastructure.

FlatironDragados (USA) is delivering the design-build project, which includes the duplication of the existing immersed-tube tunnel system through two new large-diameter parallel tunnels constructed beneath the bay.

The project incorporates one of the largest variable-density slurry TBMs used on a US road infrastructure scheme, specifically designed to operate within marine sediments and reclaimed ground conditions.
hampton_roads_bridge-tunnel_expansion_project_eeuu_2022_405_north_trestle_north_island

Project data

·

More than 100,000 vehicles/day

·

2 parallel tunnels of 2.4 km

·

743,000 m³ excavation volume

·

12.65 m internal diameter

·

14.05 m excavation diameter

·

Constructed beneath Chesapeake Bay

·

Variable-density slurry TBM

·

Delivered under a Design-Build contract