Parallel Thimble Shoal Tunnel (PTST)

Virginia, USA

TBM EPB

Construction method

1.935 m

Excavated length

11.89m/13.25m

Internal Diameter / Excavation

1 TBM

TBM number

45 m

Depth

The Parallel Thimble Shoal Tunnel (PTST) project eliminates a major bottleneck on the Chesapeake Bay Bridge-Tunnel, one of the most iconic pieces of transportation infrastructure in the United States.
014_chesapeake_tunnel_jv_virginia_eeuu_2024_428_5
The project involves constructing a new tunnel that enhances the connection originally established in the 1930s—which was previously improved by the creation of the Bay Bridge-Tunnel in the 1960s. The new structure spans 1,935 meters beneath the Thimble Shoal Channel, doubling the existing crossing's capacity and significantly improving the infrastructure's safety and service levels.
FlatironDragados (USA) is executing the work using a large-diameter Earth Pressure Balance (EPB) tunnel boring machine, implementing a particularly complex solution due to the tunnel's shallow cover, its sub-sea alignment, and the ground's poor geotechnical characteristics.
007_chesapeake_tunnel_jv_virginia_eeuu_2021_368_island_1_16
The project includes two traffic lanes, shoulders, and a separate emergency evacuation corridor, thereby bolstering the resilience and operational capability of this strategic East Coast corridor.

Project data

·

1,935 m tunnel length

·

New tunnel beneath Thimble Shoal Channel

·

267,000 m³ excavation volume

·

11.89 m internal diameter

·

13.25 m excavation diameter

·

Excavated using an EPB TBM

·

Two traffic lanes plus shoulders

·

Dedicated emergency evacuation corridor

·

Part of the Chesapeake Bay Bridge-Tunnel corridor