North West Rail Link Sydney

Sydney, Australia

TBM rock + Conventional

Construction method

14,455 m

Excavated length

6.17m/6.99m

Internal Diameter / Excavation

4 TBM

TBM number

The design and construction contract for the North West Rail Link project in Sydney involved the delivery of one of Australia’s most significant metropolitan rail expansions.

The project included the construction of two twin tunnels, each 15.5 km long with an internal diameter of 6.17 m, running between the existing Epping station and the new Bella Vista station. In addition, five underground stations were built—Cherrybrook, Castle Hill, Showground, Norwest, and Bella Vista—each with approximate dimensions of 180 m in length and 20 m in width.

estacions_l9_besosm_barcelona_2010_256_6

The works were completed with two service shafts located at Epping and Cheltenham, 59 cross passages, a crossover cavern at Castle Hill measuring 184 m in length, 21 m in width, and 14 m in height, as well as two mined tunnels, each 300 m long, connecting the Epping shaft with the existing Epping station.

Approximately 70% of the line tunnels were excavated through sandstone formations of the Hawkesbury and Mittagong units, while the remaining sections passed through competent shale from the Ashfield formation. Excavation was carried out primarily using four double-shield tunnel boring machines, with an excavation diameter of 6.99 m.

Segment rings were transported from the portals to the TBMs using rubber-tyred vehicles, while excavated material was removed via conveyor belts. To minimise impact on the surrounding urban environment, all potentially disruptive night-time activities were carried out using appropriate protective measures and acoustic barriers, including spoil stockpiling and segment handling operations.
north_west_rail_link_sidney_australia_2018_376_sydney_metro_train_testing_windsor

Cross passages were excavated simultaneously with tunnel excavation using small excavators. This concurrent workflow was made possible through the use of mobile platforms that allowed equipment to cross safely, reducing interference and improving overall efficiency.

The scheme further strengthens DRAGADOS experience in large-scale underground railway infrastructure delivered across major international cities

Project data

·

More than 27 km of twin tunnels

·

5 underground stations

·

4 double-shield TBMs

·

59 connection galleries

·

184 m-long railway cavern

·

2 service shafts

·

1.06 million m³ excavated

·

6.99 m excavation diameter

·

6.17 m internal diameter

·

Completed in 2016