Ottawa Light Rail

Ottawa, Canada

Conventional with roadheaders

Construction method

2,533 m tunnel and 3 stations

Excavated length

9.0 m

Internal Diameter / Excavation

3 Sandvik MMT-720 Roadheaders

TBM number

The Ottawa Light Rail Transit project includes a 2,533 m underground section beneath downtown Ottawa, incorporating the Lyon, Parliament and Rideau underground stations
ottawa_tren_ligero_canada_2016_299_blair_station
As this is a concession contract, the scope goes beyond the design and construction of the infrastructure and also includes the operation and maintenance of the 12.5 km Confederation Line for a period of 30 years.
The Sequential Excavation Method (SEM) was selected for the execution of the entire underground section. Excavation works were carried out using three heavy-duty Sandvik MT-720 road headers, as the alignment runs through limestone formations.

Project data

·

2,533 m of mined tunnel

·

3 underground stations

·

Constructed using SEM

·

9 m excavation diameter

·

18 m station excavation diameter

·

30-year operation and maintenance concession

·

Part of the 12.5 km Confederation Line

·

Completed in 2017