Construction method

11,000 m

Excavated length

The High-Speed Rail Sector 2 project forms part of the Basque Country High-Speed Rail Network and includes more than 11 km of tunnels and underground galleries along the route between Mondragón and Bergara.
lav_sector_2_vizcaya_2024_428_tunel_udalaitz_este

The works comprise the construction of the Karraskain and Udalaitz twin-bore tunnels, developed for single-track high-speed rail operations and designed to improve regional and national rail connectivity.

One of the main engineering challenges was excavation through the Udalaitz karst system, a highly complex geological environment that significantly influenced both the design and construction process.

Dragados carried out the excavation using the New Austrian Tunnelling Method (NATM) with drill-and-blast techniques, incorporating an intermediate access point to optimise construction progress within the Udalaitz Tunnel.
ave_vitoria-s_sebastian_sector_2_guipuzcoa_2019_316_3

Project data

·

More than 11 km of tunnels and galleries

·

Udalaitz Tunnel exceeding 9 km total length (two bores)

·

12 cross passages

·

732,352 m³ excavation volume

·

52 m² tunnel cross-section 

·

Excavated using NATM

·

Drill-and-blast excavation

·

Constructed within a complex karst system 

·

Intermediate access point located 3.5 km from the southern portal