Hydroelectric Power Plant Site C (11)
Columbia, Canada
60 m
Height (Gross jump)
890,000 m³
Volume of concrete / materials
2,31hm³
Reservoir volume
The Site C Hydroelectric Power Station is located on the Peace River, in northern British Columbia, approximately 6.21 miles from Fort St. John. The overall development of the project has been structured into several contracts, with the civil works for the spillways and the powerhouse awarded to a joint venture in which DRAGADOS participates.
The scope of the contract includes the construction of an outdoor hydroelectric powerhouse and three spillways, two of which are equipped with gates. The hydraulic regulation system comprises six wagon gates and three radial gates, designed to discharge flows at different operating levels.

The power station consists of six generating units, each made up of an intake structure, a steel penstock with a diameter of 33.46 ft and a length of 262.47 ft, incorporating a flexible joint inits central section, and the corresponding powerhouse structure.









Project data
Project data
·
·
·
·
·
·
·