Joint Water Pollution Control Plant Effluent Outfall Tunnel, LA, USA
Los Angeles, USA
TBM Hydroshield
Construction method
11.200 m
Excavated length
5.49m/6.58m
Internal Diameter / Excavation
1 TBM
TBM number
145 m (cover)
Depth
The Joint Water Pollution Control Plant Effluent Outfall Tunnel comprises a new 11.2 km-long tunnel designed to strengthen the treated wastewater discharge system serving one of the largest treatment facilities in the Los Angeles metropolitan area.

Currently being delivered by FlatironDragados (USA), the project will increase the capacity and redundancy of the Wilmington treatment plant outfall system, providing an additional 2.5 hm³ per day and enhancing the reliability of critical wastewater infrastructure in California.
The alignment passes through highly complex geological conditions, including alluvial sands, rock formations and two significant fault zones, among them the seismically active Palos Verdes fault system.






One of the project’s most innovative features is the use of post-tensioned segmental lining rings, a pioneering solution in the United States designed to withstand high operational water pressures while ensuring long-term watertightness.
Project data
Project data
·
11.2 km tunnel length
·
Additional capacity of 2.5 hm³/day
·
383,080 m³ excavation volume
·
5.5 m internal diameter
·
6.58 m excavation diameter
·
Excavated using a Mixshield TBM
·
Water pressures of up to 10 bar
·
Crosses the Palos Verdes and Cabrillo fault zones
·
First US project using post-tensioned segmental rings