Palisades Tunnel

New York, USA

TBM rock - Single shield

Construction method

1.551 m

Excavated length

7.67m/8.84m

Internal Diameter / Excavation

2 TBM

TBM number

The Palisades Tunnel is a key component of the Hudson Tunnel Project, a strategic infrastructure programme designed to increase rail capacity along the United States Northeast Corridor and strengthen connections
pkg1a_ph_20260518_nj_gatewaypalisadestonnelle_panynj_gdc_dji_mm_65
The project involves the construction of two parallel railway tunnels beneath the Palisades cliffs, forming the first excavated section of a new rail link that will ultimately connect with Penn Station beneath the Hudson River.

Dragados is carrying out the works using two state-of-the-art hard rock tunnel boring machines excavating through Palisades Diabase, one of the hardest rock formations currently being tunnelled in North America.

The development also includes cross passages, a major retrieval shaft and associated railway infrastructure aimed at increasing the capacity and resilience of one of the country’s most important rail corridors.

img-20251204-wa0002_2

Project data

·

Two tunnels of 1,550 m each

·

185,000 m³ excavation volume

·

8.73 m excavation diameter

·

7.70 m internal diameter

·

Excavated using 2 hard-rock TBMs

·

6 cross passages

·

36 m-deep retrieval shaft

·

Excavation through diabase exceeding 200 MPa

·

Part of the Hudson Tunnel Project

·

Ongoing project. Construction started in 2024