North Winston-Salem Belt

North Carolina, USA

Dual carriageway

Road type

6.6 km

Length

New route

Purpose

2

Number of roads

3

Number of lanes

2

Number of links

The Winston-Salem Northern Beltway (Eastern Section) delivers 6.6 km of new controlled-access highway, improving regional connectivity between Kernersville and Walkertown in Forsyth County.

Delivered by FlatironDragados (USA) for the North Carolina Department of Transportation (NCDOT), the route crosses creeks, waterways and wetland areas, requiring significant environmental integration measures and specialised earthworks solutions.

winston-salem_northern_beltway_eeuu_2020_353_6

The project length is 4.1 miles traversing two creeks along with several streams and wetland environmental sites.

The project includes GPS and 3D guidance-controlled machines that were used extensively on the project for construction survey layout, excavation and earthwork activities and Portland cement concrete pavement activities using stringless operations.

Earthen fills at bridge approaches were constructed independently of the adjoining portions of fills in order to start settlement periods sooner. The use of settlement control sensors to determine when settlement ceased, instead of relying solely on specified time durations, allowed for the advancement of piles and subsequent bridge construction activities.
winston-salem_northern_beltway_eeuu_2020_353_5

Project data

·

4.1 mi highway

·

6.5M yd³ of earthworks

·

7 crossings over creeks

·

11 road crossings

·

9 sound barrier walls (2 mounted on bridges)

·

187,431 ST of aggregate base

·

320,000 yd² of Portland cement concrete pavement

·

292,172 ST of asphalt concrete

·

GPS and 3D machine control technology