Orlando Int. Airport | Terminal C – Phase 1X

Orange County (Florida), USA

GREATER ORLANDO AVIATION AUTHORITY

Customer

2027

Ending

The project comprises the expansion of aircraft aprons and taxiway infrastructure associated with Terminal C, together with the construction of new airside facilities and operational support buildings.
side_phase_2b_copy
The scope of works includes the expansion of aircraft parking aprons, extensions to Taxiways E1 and B, and the construction of a new Taxiway B13, enhancing airside connectivity and operational capacity.
The project also incorporates new North and South Remain Over Night (RON) areas for extended aircraft parking, together with all associated electrical works, drainage systems, pavement construction, airfield lighting, markings and signage.
dji_20260430112327_0002_copy
In addition, the scope includes the construction of a Ground Support Equipment (GSE) Facility, along with auxiliary installations such as fuel facilities, technical stations, emergency power generators, fencing, internal roads and underground utilities, including drainage, potable water, power supply and aircraft fuelling systems. The works are part of the phased development of infrastructure supporting Terminal C at the airport.

Project data

·

North and South RON aircraft parking areas

·

Construction of Ground Support Equipment (GSE) Facility

·

Underground utilities: drainage, power, potable water and aircraft fuelling

Did you like this project? Share it! 

Related projects