Radials R-2, R-3 and R-5

Madrid, Spain

Highways

Road type

80.40, 33.90, 30.9 km

Length

New route

Purpose

2

Number of roads

2 and 3

Number of lanes

5,6,8

Number of links

The R 2, R 3 and R 5 motorway programme delivered more than 145 km of new road infrastructure, improving access to Madrid and increasing capacity across the metropolitan road network.

The works included new toll motorways, sections of the M 50 ring road, major interchanges, viaducts, service areas and supporting infrastructure designed to enhance mobility along the capital’s main transport corridors.

31594-autopista_radial_r-2_madrid-guadalajara_-_200309_-_autopr2-2727-0011
The project also incorporated environmental mitigation measures through numerous overpasses, underpasses, wildlife crossings and cut-and-cover structures

Project data

·

145 km of motorways and ring roads delivered

·

14 major interchanges • 173 overpasses and underpasses

·

1,410 m Jarama River viaduct • 6 major viaducts across the programme

·

3 toll plazas

·

2 service areas

·

R2 and M-50 (between R1 and R2): 50 miles long. 82 overpasses and 23 underpasses.

·

R3: 21 miles of toll highway. 2 roads of 2 and 3 lanes. 6 interchanges. 3 large viaducts: Vicálvaro (1,116 ft), Jarama River (4,626 ft) and Arroyo Pantueña (1,995 ft) and 2 smaller. 26 overpasses, 25 underpasses, a cut and cover tunnel.

·

R5: 19.2-mile toll highway. 2 roads of 2 and 3 lanes. 8 interchanges and 3 viaducts of 249, 174 and 218 ft. 27 overpasses, 13 underpasses. 3 toll areas and 2 service areas.