South Breakwater At Barcelona’s Port

Barcelona, Spain

Vertical dike / slope

Project type

4096 m

Breakwater length

61

Concrete caissons

6.020 Mt

Dredging volume (m³)

The South Breakwater of the Port of Barcelona forms part of the southern port expansion and involved the construction of more than 5 km of maritime infrastructure, designed to increase port capacity and improve protection for future port facilities.
puerto_de_barcelona_dique_sur_f_1_y_2_barcelona_junio2008_260_octubre07_3
DRAGADOS works combined several structural typologies, including rubble mound breakwaters protected with concrete armour units weighing up to 60 tonnes and vertical sections constructed using large prefabricated caissons.
The development required major dredging, reclamation and marine construction activities, creating new operational port areas and supporting the long-term growth of the Port of Barcelona.

Project data

·

Breakwater length: 17,388 ft

·

Dredging: 3,151,834.005 cy by seagoing suction dredger

·

Cells’ infill: 759,893 cy

·

Stone Works (sections I and II): 11,000,000 tons

·

Precast concrete blocks: 553,178 cy

·

Caissons: 61 units

·

Stone Works (section III): 6,019,925 tons